We read the drawing, qualify the shop to the part, and own production from raw stock to your dock. No brokers in the chain.
Every tolerance, every callout, before a single chip is cut. The spec is the contract.

We qualify the shop to the part, not the part to whatever shop is free. Right machine, right material, in house and on the rack.

First article to full lot, measured and traceable. 7075-T6, finished, inspected, nested, and accounted for.


STEP file in, drawing reviewed, a quote that becomes the actual cost. No moving target.

Fixtures set, first cut staged. The decision point, marked in red on the schedule.

Measured against the print. 2.375 ±.001. It either passes or it doesn't, and we tell you which.

Wrapped, tagged, on the truck. Lot 742-203, out the door, to your dock.
Real shops, not brokers. Every one vetted in person or by video walk-through.
You see the line. Progress photos, inspection reports, one direct contact.
Problems flagged the day we find them, not buried until it's too late.
Three tolerance mistakes cost a month of lead time and 30% of the prototype budget. The checklist that catches them before the drawing leaves your desk.
Read ›A marketplace quotes your part in four minutes. Eleven weeks later the delivered cost is 67% higher. The first number never meant anything.
Read ›A prototype ships in four days. The 500-unit run is quoted at eight weeks. Three months later, still nothing. Here is the gap, and its specific shape.
Read ›
However rough. We tell you what it costs to make before a shop ever sees it.